July 2026Offshore geotechnical investigation — Bukakata intake, Lake Victoria
Six over-water boreholes along the raw water intake pipeline route (RWPS +50 m to +800 m) from an anchored floating platform on Lake Victoria — rotary drilling, SPT, undisturbed sampling and a factual field report with bearing capacity analysis from SPT N-values.
- Boreholes at +50, +100, +150, +350, +600 and +800 m offshore
- Rotary drilling from an anchored platform, not wash boring
- Field factual report issued inside three weeks of completion
Client — SOGEA-SATOM for NWSC / Ministry of Water & Environment






















